The project includes pedestrian activated crosswalk signals for the crossing of South Franklin Street at First Street. South Franklin Street is a heavily used pedestrian route from a residential neighborhood to the downtown district. Proposed work includes modification of curb ramps and installation of pedestrian signals at the crosswalks of South Franklin Street at First Street.

Anticipated Schedule
Construction is set to begin in Spring of 2025.
Project Documents
A link to the construction plans is available here.