Standard Details

Index of Standard Details

Please note: November 1, 2004 is the revision date for all documents unless otherwise noted. Download the Index of Standard Details (PDF).

Number
Name
Revision Date
AR-1
Precast Chamber For Air Release Valve (PDF)
August 11, 2014
AR-3
Precast Chamber For Air Release Valve (Sewer) (PDF)

BO-1
Blow Off Assembly (PDF)
August 11, 2014
BP-1
Backflow Preventer Double Check Valve Assembly (3/4 to 2”) (PDF)
August 11, 2014
BP-2
Backflow Preventer Double Check/ Double Gate Valve Assembly (PDF) (3” to 8”)
August 11, 2014
CA-1
Reaction Blocking Water and Sanitary Sewer Force Main Facilities (PDF)
August 11, 2014
CA-2
Concrete Anchors (Crest Anchors) (PDF)
August 11, 2014
CA-3
Concrete Slope Anchor (For Slopes Over 20%) (PDF)
August 11, 2014
CA-4
Mechanical Restraining Devices for Ductile Iron Pipe (PDF)
August 11, 2014
CC-1
Concrete Cradle (PDF)

CE-1
Concrete Encasement (PDF)
August 11, 2014
CM-2
Compound Meter Installation Precast Vault (PDF)
August 11, 2014
CO-1
Sanitary Cleanout (PDF)

CO-2
Sanitary Cleanout for Bends Greater than 45 Degrees (PDF)

CO-3
Traffic Bearing Cleanout Cover (PDF)

CS-2
Typical Water or Sewer Main Location within Town Right-of-Way (PDF)
August 11, 2014
CS-3A
Neoprene Sealed Casing Installation (1 of 2) (PDF)
August 11, 2014
CS-3B
Neoprene Sealed Casing Installation (2 of 2) (PDF)
August 11, 2014
CS-4
Sealed Casing Installation with Plastic or Steel Collar (PDF)
August 11, 2014
CV-1
Check Valve Assembly and Bypass (PDF)
August 11, 2014
DP-1
Dumpster Pad and Screen Detail (PDF)
April 7, 2014
FC-1
Sanitary Sewer Standard Manhole Frame and Cover (PDF)
June 17, 2014
FC-4
Sanitary Sewer Watertight Manhole Frame and Cover (PDF)
June 17, 2014
FC-5
Water Standard Manhole Frame and Cover (PDF)
August 11, 2014
FH-1
Fire Hydrant Installation (PDF)
August 11, 2014
FH-2
Fire Hydrant Painting Schedule (PDF)
September 11, 2015
GD-1
Gate Detail (PDF)

GT-1
Grease Trap with Manhole Lids (PDF)

GT-2
Grease Trap with Access Hatches (PDF)

GT-3
1000 Gallon H-20 Load Rated Grease Trap (PDF)

HC-1
Waterline / Sanitary Sewer Crossing (PDF)
August 11, 2014
HC-2
Storm Drain / Sanitary Sewer Crossing (PDF)

HC-3
Sanitary Sewer House Connection (PDF)

HC-4
House Connection to Existing Sanitary Sewer Main (PDF)

HC-5
Lateral Connection to Polyethelene Sanitary Sewer Main (PDF)

HC-6

Double Lateral Connection to Polyethylene Sanitary Sewer Main (PDF)

January 5, 2021
HS-1
Handicap Parking Sign (PDF)

MC-1
Connection to Existing Manhole (PDF)

MH-1
Sanitary Sewer Precast Standard Manhole (Eccentric with (PDF) Monolothic Base) (PDF)

MH-2
Sanitary Sewer Precast 5’-0” Diameter Manhole (Monolothic (PDF)Base with Adaptor) (PDF)

MH-3
Manhole Invert Channeling (PDF)

MH-4
Sanitary Sewer Drop Pipe for Manhole Rehabilitation (PDF)

MH-5
Sanitary Sewer Precast Drop Manhole (Eccentric (PDF) with Monolithic Base) (PDF)

MH-6
Manhole Connection Detail for Slopes Over 15% (PDF)

MH-7
New Cut-In Manhole on Existing Line (PDF)

MS-1
Standard Manhole Step (PDF)
August 11, 2014
MV-1
Sanitary Sewer Manhole Ventilation Type A (PDF)

MV-2
Sanitary Sewer Manhole Ventilation Type B (PDF)

RR-1
Riprap Stream Stabilization with Filter Cloth Underliner (PDF)

RV-1
Pressure Reducing Valve Installation (PDF)
August 11, 2014
RV-2
8” Pressure Reducing Valve Assembly with 2” Bypass (PDF)
August 11, 2014
RV-3
Pressure Reducing Valve Individual Service (PDF)
August 11, 2014
SC-1
Standard Water Service Connection (PDF)
July 14, 2021
SC-2
Dual Water Meter Installation (PDF)
July 14, 2021
SC-3
Water Meter Installation (For 1” to 2” Meters) (PDF)
July 15, 2021
SP-1
Sample Tap Installation (PDF)
August 11, 2014
SW-1 
Typical Sidewalk Within Town Right-of-Way (PDF)
July 28, 2011
TA-1
Standard Cul-De-Sac

TA-2
Offset Cul-De-Sac (PDF)

TA-3
“T” Shape Turn Around (PDF)

TB-1
Gravity Sewer Trench Bedding (PDF)

TB-2
Pavement Repair for Utility Trench (PDF)
June 11, 2021
TB-3
Pressure Pipe Trench Bedding (PDF)
August 11, 2014
TB-4
Pressure Main / Gravity Sewer Parallel Installation Trench (PDF) Bedding (PDF)

TB-5
Flowable Fill Utility Cut Repair (PDF)
August 11, 2014
TB-7
Waterline Trench Bedding (PDF)
August 11, 2014
VB-1
Valve Box Installation (PDF)
August 11, 2014
VB-2
Small Valve Box Installation (Less than 2” or as specified) (PDF)
August 11, 2014
VB-3
Curb Stop and Box (PDF)
August 11, 2014
XS-1
Typical Road Section with Shoulder and Ditch (PDF)
June 12, 2019
XS-2
Typical Road Section with Curb and Gutter (PDF)
October 16, 2020
XS-3A
Typical Road Section with Roll Top Curb and Gutter (PDF)
October 16, 2020
XS-3B
Roll Top Curb Transition to Standard Curb Drop Inlet (PDF)

XS-3C
Roll Top Curb and Gutter (PDF)
October 16, 2020